Save time and money boxing in boiler pipework – Encasement’s video shows you how

As heating system upgrade programmes in social housing aim to reduce emissions and energy consumption while improving efficiency, there is also a need to ensure that the updated system is not only safe, but also looks good.

With Encasement’s pre-formed plywood boiler casing manufactured to exact boiler dimensions and pre-finished with durable melamine or laminate, there’s no fabrication or painting required, which provides a consistent finish, saving time and money on site.

Routine maintenance and boiler servicing is simplified too. The pre-formed casings are self-supporting, allowing them to be easily removed and replaced in seconds, dramatically reducing the time maintenance engineers need to be on site, and the corresponding cost.

See how Encasement can help you to save time and money here.

Read the full story here.

More information on Encasement boiler casing and pipe boxing solutions here.